2. Jurnal An Analysis On Kri Improvement Project In Indonesian Naval

Made, Jiwa (2019) 2. Jurnal An Analysis On Kri Improvement Project In Indonesian Naval. International Journal Of Asro -STTAL, 10 (1). pp. 77-87. ISSN 2460-7037

[img] Text
2. AN ANALYSIS ON KRI IMPROVEMENT PROJECT IN INDONESIAN NAVAL.pdf

Download (314kB)

Abstract

The FMEA method is a tool used to identify the consequences or consequences of a system or process failure and reduce or eliminate failure. In determining risk factors and system improvement priorities, traditional FMEA still has weaknesses, where FMEA traditionally places severity factors, occurrence, and detection at the same level of importance, even though in reality different levels of importance and the importance of FMEA assessment teams are ignored. In this study, the fuzzy method is integrated into FMEA where the severity factor, occurrence, and detection are assessed in linguistic form. In this fuzzy method, the weight of the interests of the FMEA assessment team is taken into account to do ranking and repair priorities. The application of Fuzzy methods to FMEA to determine significant risk factors and prioritizing improvements from various alternatives chosen for the process of repairing KRI in Surabaya Lantamal V, so that it is expected that the application of this method can improve the operational performance of Fasharkan to eliminate or reduce the risks that occur in the repair process ships in the eastern region of the fleet.

Item Type: Article
Uncontrolled Keywords: Risk Management, Failure Modes and Effect Analysis (FMEA), Fuzzy Method.
Subjects: L Education > L Education (General)
V Naval Science > V Naval Science (General)
Divisions: Program Studi > S2 Analisis Sistem dan Riset Operasi
Depositing User: Dr. I Made Jiwa Astika
Date Deposited: 11 Jan 2021 06:09
Last Modified: 11 Jan 2021 06:09
URI: http://repository.sttal.ac.id/id/eprint/62

Actions (login required)

View Item View Item