Sutrisno, Sutrisno 20. Reviewers Analysis Of The Acceleration Time And Optimal Costs Of The Shipbuilding Project Specified In The Electrical System with The Critical Path Method. STTAL Postgraduate - International Conference. (Unpublished)
|
Text
20. Reviewers Analysis Of The Acceleration Time And Optimal Costs Of The Shipbuilding Project Specified In The Electrical System with The Critical Path Method.pdf Download (376kB) |
| Item Type: | Other |
|---|---|
| Subjects: | V Naval Science > V Naval Science (General) |
| Divisions: | Program Studi > S1 Teknik Mesin |
| Depositing User: | Sutrisno Sutrisno |
| Date Deposited: | 11 Mar 2021 23:18 |
| Last Modified: | 11 Mar 2021 23:18 |
| URI: | http://repository.sttal.ac.id/id/eprint/318 |
Actions (login required)
![]() |
View Item |

