Sutrisno, Sutrisno 20. Reviewers Analysis Of The Acceleration Time And Optimal Costs Of The Shipbuilding Project Specified In The Electrical System with The Critical Path Method. STTAL Postgraduate - International Conference. (Unpublished)
Text
20. Reviewers Analysis Of The Acceleration Time And Optimal Costs Of The Shipbuilding Project Specified In The Electrical System with The Critical Path Method.pdf Download (376kB) |
Item Type: | Other |
---|---|
Subjects: | V Naval Science > V Naval Science (General) |
Divisions: | Program Studi > S1 Teknik Mesin |
Depositing User: | Sutrisno Sutrisno |
Date Deposited: | 11 Mar 2021 23:18 |
Last Modified: | 11 Mar 2021 23:18 |
URI: | http://repository.sttal.ac.id/id/eprint/318 |
Actions (login required)
View Item |